The snow is here…and so is a wall!
Tuesday, November 18th, 2008
Great strides have been made in our Construction Project and Capital Campaign here at the Ren! Now, when I peer out the supply closet window from this second story perch, it is likely to see a hard hatted body working from the scaffolding right outside ! Yes, not only are the retaining walls still in place, but the permanent concrete, foundation walls, now surround the perimeter. Waterproofing of these walls has been completed and column footings are in place in the central area. A second story is taking some shape and gravel backfill is at half height. The floor platform will follow shortly. Structural steel is scheduled in the next two weeks and joists will proceed, the first week of December. The electricians are following right behind the masons and completing conduit installations. On the ground, the center of the project looks like a giant mud wrestling pit, as these dedicated workers tromp through the muck to beat the clock and get everything enclosed before the heaviest of winter hits. Activity is at a fever pitch and identifiable areas are taking shape and becoming recognizable. The outline of a new elevator shaft is prominent. What a welcome new addition for the Renaissance! An elevator will allow easier access for all, most especially our patrons who have difficulty navigating the stairs.
Fortunately, I will be able to continue my voyeurism from the supply closet for several more months as there is a windowed doorway as well, in the main hallway which affords a view. I peered out yesterday, and practically leapt out of my skin to see through the glass, inches from my own face, a worker placing blocks and cementing them with concrete. It was quite timely actually as the entertainment here at the Ren was a Pink Floyd Tribute to “The Wall”. So…… All in all, it’s just another brick in the wall! Stay tuned! The days ahead promise some big changes in the appearance of this exciting renovation!